FAQ Użytkownicy Grupy Galerie Rejestracja Zaloguj
Profil Zaloguj się, by sprawdzić wiadomości Szukaj

mbt shoes on sale Second, the master antenna telev

 
Napisz nowy temat   Odpowiedz do tematu    Forum Strona Główna -> Wielkie lasy
Autor Wiadomość
52sale5126am




Dołączył: 18 Gru 2010
Posty: 529
Przeczytał: 0 tematów

Ostrzeżeń: 0/3
Skąd: England

PostWysłany: Sob 8:51, 07 Maj 2011    Temat postu: mbt shoes on sale Second, the master antenna telev

Acceptable smoke fire control room,[link widoczny dla zalogowanych], temperature, flame, flammable gas detectors and fire alarm signal flow indicator, repair valves, pressure alarm valve, manual alarm button, the button's action tied to consumer fire signal. To display the fire water, fire water tank level, showing the power and fire pump operating conditions. Can be coordinated control of all fire-related equipment.
The second floor to the eighth floor of the nursing station, a telephone junction box are separate from the nursing station on the layer of the unified management of the ward phone.
Fire emergency radio and this project shared a set of background music audio device. System uses a 100V constant pressure output, and set the standby amplifiers, the capacity of a fire emergency radio also 1.5 times the capacity.
Fire communications system
In the fire control room but also can show the power status of the pump spray, work status and fault conditions and water flow indicator, wet alarm valve, safety valve working condition signal.
Fire hydrant button action, direct start the fire hydrant pumps, fire alarm control room area and receive feedback.
Hospital Surgical Building Engineering design experience weak


Abstract: Recently, I completed the First People's Hospital, a surgical floor area of ​​weak project design. Now, I talk about the experience in the design of shallow, inappropriate, please correct me experts.
Keywords: Hospital, automatic fire alarm and fire control linkage system antenna television system unit call system
Recently, I completed the First People's Hospital, a surgical floor area of ​​weak project design. Now, I talk about the experience in the design of shallow, inappropriate, please correct me experts.

          

More control and display functions in accordance with
Object classification system protection
Linkage fire control room console control line can be controlled manually by direct spray pump, and receive feedback.
5.1, fire hydrant pump control
Letter system, elevator control system monitoring, non-fire power off control system components.
Second,[link widoczny dla zalogowanych], the master antenna television system



Automatic fire alarm circuits are used NH-BV-2X1.5 wear a tube inside the SC20 Concealed in the roof.
I refer to this design
This project directly in the fire alarm control room set up an outside line, and set the fire special telephone switchboard.
The line of control in this project are embedded pipe joint SC20, are used directly to control the line of ZR-KVV-7X1.5 SC40 laying pipe to wear the appropriate equipment electrical control box.
Fire emergency broadcast system
By
This project uses centralized alarm control system, according to the two bus design.
Fire alarm, the fire control room fire situation under control of the pressure to send air valve related to layer, electric dampers, and start the appropriate positive pressure blower, exhaust fan, exhaust valve 2800C blown off, fire dampers 700C fuse off and the feedback signal to the fire control room operation.
The total number of address coding system should be set aside 15% to 20% margin.

Fire box of the engineering features of each fire hydrant broken glass buttons, fire alarm control linkage by starting the fire pump to meet the The location of fire box provided by the equipment of professional information.
Fire this building as a class construction, automatic fire alarm system, according to a set level of protection for centralized alarm system.
Air conditioning and blower damper on the Jiefeng tube closure, interlocking stop air conditioners and fans and the police.
Fire control room dedicated
Kai Shuifang and disinfection of the works between the use of thermal detectors, basement overseas cable racks, power distribution equipment, a layer of fire control room and computer room cabling under the floor the ceiling and overhead cables were deposited setting temperature . In addition, the remaining places are set smoke detector. Detector layout, full compliance with the
The system uses unshielded UTP cabling system. Computer vertical lines of fiber optics, telephone lines use three types of vertical large number of cables. Weak wells located on each floor 19 This project in various offices, treatment rooms, the duty room, nursing stations, conference rooms, offices and pharmacy charges, etc. according to the actual need to set up information outlets. Information outlets are selected RJ45 socket dual-port information, each information outlet cable as a 4 on the wiring twisted pair cable and a 2 on the twisted pair cable, corresponding to voice and data.
, the water moves to the fire control room alarm indicators, while wet alarm valve action, hit the alarm bell ring for the hydraulic pressure switch alarm, signal into the fire control room, the sprinkler pump Fire control room receiving feedback signals.
The second floor to the eighth floor of the Engineering
In the fire control room but also can show the power status of the fire hydrant pump, work status and fault conditions.
System consists of automatic fire alarm system, fire control systems, fire emergency radio systems, fire links
By elevator machine room and smoke room, air conditioning, private telephone room set fire extension.
Linkage fire control room console manual control through direct control line exhaust fan, and accept the feedback signal.
More control and display functions in accordance with
national building standards designed Atlas are: ;,
Three wards call system
This project set in the basement of the substation control module linkage box, air conditioning units and some other non-fire low-voltage circuit breaker with outlet shunt release, confirmed by the fire control room in fire-related power after the break.
Linkage fire control room console control line can be controlled manually by direct fire hydrant pump, and receive feedback.
Fire control room automatically or manually controlled positive pressure blower to start and stop, and turn on the fire floor and their linkage adjacent floors of the positive outlet.
Construction, in the host wall at the display near the ceiling, door,[link widoczny dla zalogowanych], bedside unit and a bathroom call buttons should be embedded at the junction box.
I see this design
Laying 400x200 weak wells dedicated trunking, installed, sealing layers of layers of materials with the fire. The laying of 40x5 weak wells are usually flat strip, as a weak system of dedicated ground wire, weak wells located LEB each local equipotential bonding terminal box. The laying of weak layers within the corridor ceiling trunking, the weak lines separated by partitions.
Fire, automatically or manually open the relevant layer or in the emergency broadcasting, cut off the background music broadcast simultaneously. Fire emergency radio control procedures: the first floor on fire, start the first floor, second floor and the underground layers, or in the emergency broadcast; in the basement on fire, start the first floor and underground layers of fire emergency radio; the second floor above the fire, Start on the lower layer and the adjacent fire emergency broadcasts.
Non-fire control system to cut off power supply
Automatic fire alarm system
Fire control room
Fire control equipment, dual power supply and automatic switch device located at the end and use UPS as backup power, UPS from the equipment vendor.
Well
Building height of the building 47.7m,[link widoczny dla zalogowanych], basement, ground floor ten, construction area of ​​14,000 m2, belongs to a class of high-rise buildings. Shear wall structure as a framework, based on an independent basis under the form of a column. Corridor ceiling high 2.6m, high office and ward part of the ceiling 2.8m.
fire control room to the weak metal trough in the ceiling installation. Layout, they also noted that the fire control room with nothing to prevent the electrical lines through.
5.2, spray pump control
Four cabling system
This project three manual alarm button located on each floor, located in the central building elevator rooms, evacuation stairwell on the left side and right side of the aisle before the chamber evacuation stairwell side of the aisle before the room to meet the the requirements of Article 8.3.1. Manual alarm button with a phone jack.
This project in the first floor the fire control room, and has direct access to the outside of the door.
System components
Monitor all elevator control panel in the fire control room console. According to the fire, the elevator control panel issued a directive, command the elevator run by the fire. Can all elevators Renyiyitai or all intercom, indicating the reasons for changing the operational procedures, in addition to the fire to keep the elevator running, the rest were forced to return the first floor elevator. Elevator display panel showing the elevator running state, such as layers, normal, fault, open, close and so on.
Fire occurs, fire linkage plate floor console, the corresponding exhaust port opens, and start the roof exhaust fan. Temperature reaches 2800C, the exhaust valves fuse blown, exhaust fan interlock stop.
the relevant norms are: lightning protection of electronic information systems technical specifications Hospital building design
Cabling system of the project settings to support voice, data, graphics, images and other multimedia services.
Speakers installed in public places power 3W, excluding the basement level and the stairs to the roof from 2.5m wall, the rest are embedded in the ceiling installation. Layout, to ensure the sub-region from a fire in any part of the distance to the nearest one speaker does not exceed 25m.
More control and display functions in accordance with
Set the project in a layer of integrated wiring room, room set equipotential bonding terminal box, and set a dedicated grounding lines, using BV-1X25mm2 lead to the building through the total PVC pipe equipotential bonding terminal box. Integrated wiring system uses common grounding, grounding resistance less than 1 ohm.
To reduce losses, the project will be front-end box of the weak in six wells, AC220V power outlet nearby. Distribution splitter box located on each floor. System uses the distribution branch, the user level is not less than 65dB. In addition to wards to 2.0m away from the terminal box, the other terminals were installed 0.3m from the ground.
This project all the stairs on each floor above the 0.2m at the entrance to set sound and light alarm device, fire can express the location of the fire floor, fire floor to guide firefighters to find, easy to put out fires.
Case of fire, the fire control room under the fire, the control module through the power distribution room, the fire cut off the normal area lighting and power supply.
5.3, smoke, smoke control facilities
When the fire sprinkler water
Fire control equipment Fire control room by the fire alarm control host, linkage control panel, CRT monitor, printer, emergency broadcasting equipment, fire communications equipment, elevator control panel and power supply equipment and other components.
Weak system of this design include: automatic fire alarm and fire control systems; community antenna television system; broadcasting system (with background music and fire emergency radio); room call system; integrated wiring system (including computer networks and communication systems .) Mobile communication signal coverage system consists of the telecommunications sector to design, install, and not within the scope of this design. One automatic fire alarm and fire control system
This project for the temporary high pressure fire hydrant system, water supply system, usually controlled by a pressure switch automatically to maintain pipeline pressure booster pump, when the pipeline pressure is too low, the direct start the main pump.
Elevator control system monitoring
have wards, according to Each layer is hosted in the nursing station, the election Wall Mount. Corridor display hanging screen suspended from the central corridor, located near the host and the corridor Guaping AC220V power outlet. Corridor use double-sided hanging panel display type. Selection of the system determined by the Party, was elected with a basic type, from the bedside unit to 1.1m; elected to use the intercom type, the bedside unit from the ground should be 1.4m. Bathroom call buttons should be set so that the patient emergency call.
Automatic sprinkler system in this project as temporary high-pressure water supply system, usually from the roof water tank and booster pump pressure switch automatic control to maintain the pipeline pressure, the pressure is too low when the pipe network, the direct start the main pump.
equipotential bonding terminal box, set the ground dedicated lines, the use of BV-1X25mm2 lead to the building wearing a PVC pipe equipotential bonding terminal box total. Automatic fire alarm system uses common grounding, grounding resistance less than 1 ohm. Terminal box from the other potential fire electronic equipment to the grounding line using a dedicated BV-1X4 mm2.
Fire control system
In the fire control room of the fire hydrant pumps, spray pumps, positive pressure blower, exhaust fan control module either through linked automatic control, the console can also be linked directly to the line of control through manual control, and receive their feedback .
More articles related to topics:


[link widoczny dla zalogowanych]

[link widoczny dla zalogowanych]

[link widoczny dla zalogowanych]


Post został pochwalony 0 razy
Powrót do góry
Zobacz profil autora
Wyświetl posty z ostatnich:   
Napisz nowy temat   Odpowiedz do tematu    Forum Strona Główna -> Wielkie lasy Wszystkie czasy w strefie EET (Europa)
Strona 1 z 1

 
Skocz do:  
Możesz pisać nowe tematy
Możesz odpowiadać w tematach
Nie możesz zmieniać swoich postów
Nie możesz usuwać swoich postów
Nie możesz głosować w ankietach


fora.pl - załóż własne forum dyskusyjne za darmo

Elveron phpBB theme/template by Ulf Frisk and Michael Schaeffer
Copyright Š Ulf Frisk, Michael Schaeffer 2004


Powered by phpBB © 2001, 2002 phpBB Group
Regulamin